Assir Desalination Plant

Assir, KSA

KFIP

Jubail, KSA

Cofferdam & Seawall

Jubail, KSA

Diwan Underpass

Jeddah, KSA

King Faisal Naval Base

Jeddah, KSA

Madina-Yanbu Desalinaion Plant

Yanbu, KSA

Shoaiba Power Plant

New York, USA

Marine Port Faransan

Farasan Iceland, KSA

Completed Projects

Owner

Saudi Electricity Co. (SEC)

Location

Shuqaiq, Saudi Arabia

Construction Period

06/2014 - 04/2018

Construction Engineer

Poyry Energy Ltd. Switzerland

Contract No. B1303A-C018 - Shuqaiq Steam Power Plant (Stage 1) Subcont. for Civil & Bldg. Works for Power Block No. 3 & 4 & BOP & Cooling Water Pipeline. (Project in 50% J.V.) (Subcontract signed on: 01.06.2014)

The contract include the following: Civil works for Power Block #3 & #4 Area: Foundation & structures, Cable routing work (cable trench, duck bank, electrical manhole, etc.) Pipe laying work (civil works for pressured-pipe laying, Pipe sleeper, Direct buried, thrust block, pipe trench / tunnel) and drainage (storm water & sanitary pipes). Civil Work for BOP Area: Foundation and structures, cable routing work (cable trench, duct bank, electrical manhole, etc.) Pipe laying work (civil works for pressured-pipe laying, pipe sleeper, direct buried, thrust block, pipe trench/tunnel), drainage (storm water & sanitary pipes) and fence & gate work (BOP + Tank farm).Civil work for cooling water pipeline: Pipe laying work (civil works for pressured-pipe laying, pipe sleeper, direct buried, thrust block, pipe trench/tunnel) Building works for Power Block #3 & #4 + BOP (total 44 nos.); Temporary work, earthwork, reinforced concrete work, masonry work, plaster work, painting work, water proofing work, tile and flooring work, interior work, door and window work, miscellaneous metal work, miscellaneous work, and steel structure work. 

Total Area of Buildings: 107,367 m²
Major Quantities:
– Excavation: 356,672 m³
– Backfill: 115,865 m³
– All type of concrete: 165,411 m³
– Re-bar: 18,215 m.t.
– GRP Pipe dia. 600 – 1500mm: 1,079 m
– UPVC pipe dia. 150mm to 500mm: 1,005 m
– Fence: 3,638 m
– Structural steel: 361 m.t.

Owner

Seaports Authority (SEAPA)

Location

Farasan, Saudi Arabia

Construction Period

01/2015 - 03/2018

Construction Engineer

Arabian Consulting Engineering Center, Jeddah Saudi Arabia

Improvement and Expansion of Marine Facilities at Port of Farasan, Saudi Arabia

The Phase 1 expansion of the Port include: Study and perform hydrographic studies, soil investigation and complete detailed design of quay walls, dolphins, breakwaters, revetments, reclamation and external works. The detailed scope of works is as follows: 

A. Dredging include deepening of existing navigational channel from – 6.0m to – 9.0m, turning circle, deepening of North Basin from -1m to – 8.5m and East basins and Port berth from -1.0 to -5.5m together with provision of navigational aids (buoys and beacons).

B. Berths (Quaywall) include Design and Construction of quay wall of length 504m at -8m and top level at +3.00 for small craft berth (for general cargo) to receive ships of capacity 15,000 DWT and 711m long quaywall at -5.5m top level at + 2.5m for coast guard berths respectively with rockfill foundation, superstructure with reinforced concrete precast blocks and situ capping beam together with wharf fittings. Construction of 2nos dolphins and walkways at ferry terminal.

C. Breakwaters and Revetments include design and construction of two rubble mound breakwaters of total length 2208m for safe berthing facilities. The breakwater will be constructed with foundation blanket, core rock, under layer and armour rocks and associated revetments. 

D. External Works include asphalting, heavy duty concrete paving,concrete foundations for lighting poles, fencing and drainage pipeline

Major Quantities:
Dredging: 5,555,665 m3
Rocks: 380,787 m3
Concrete Works: 87,500 m3
Reinforcement: 14,104 Ton
Heavy Duty Paving: 40,000 m2
Asphalting: 35,000 m2
Fencing: 2,500 lm

Owner

Ministry of Defense/Naval Forces, Director of Naval Forces Engineering & Works Department,

Location

Jeddah, Saudi Arabia

Construction Period

11/2016 - 06/2017

Construction Engineer

Engineering Dept. of Ministry of Defense/Naval Forces, Director of Naval Forces Engineering & Works Department, Riyadh, Saudi Arabia

Project for installation of fuel pipeline at King Faisal Naval Base in Western fleet in Jeddah, Saudi Arabia

The main purpose of this contract is to abandon the existing underground pipeline between POL Pump House, the Storage Tanks and Fuel Recovery Unit of Diesel Fuel Facility at King Faisal Naval Base in Jeddah and replace
by constructing new pipeline.

The new pipeline construction involve two parts i.e; underground gravity pipeline of dia 50 m.m to 200 m.m. RTR (fibre glass) pipes and above ground pipeline of dia 100 m.m to 250 m.m carbon steel pipeline and sleeves at road crossings. Total pipe length 2,320m and valves 7nos.

The main activities involve; surveying the route of line, excavation of trench of pipeline, installation of pipeline, backfilling after leak tests. Installation of pipe sleepers supports, checking of stress analysis and testing of pipes.

Owner

Ministry of Defense (MOD) Royal Saudi Naval Forces (RSNF) Main Contractor: ODAS

Location

Jeddah, Saudi Arabia

Construction Period

07/2014 - 10/2015

Construction Engineer

El-Seif Engineering Contracting Company, Riyadh

Subcontract No. P130/SCA/02 Marine Works for Part C of Sawari (1) Fleet life Extension Program at King Fahd Naval Base

The subcontract work include design and construction of a new ship repair yard extension consisting of the following:

  • Dredging
  • Two mooring dolphins supported on tubular steel piles.– Logistic platform supported on tubular steel piles for heavy items.
  • Abutment and dock access ramp
  • RO intake pipe include supply and installation of GRP pipe of dia. 1,219 mm with associated civil works.
  • Rehabilitation of existing quay wall including repair of the existing structures.

Variation Orders: The works under variation orders included the following:

  1. Design works, supply, installation, grouting, cathodic protection of test piles. Supply and install steel platform to support the steel trusses with gratings and handrails. Supply, fabrication, transportation and erection of 4nos truss bridges.
  2. Additional works for FDD mooring connection include; design, supply, delivery, fabrications and installation of sliding plates, brackets and anchor bolts etc.
  3. Two access steel platforms between the stairs of docks and the mooring dolphins
  4. Navigational aids and install floating dock

Owner

Commandership of Royal Naval Forces. Naval Forces Supply and Support Division

Location

Jeddah, Saudi Arabia

Construction Period

07/2014 - 10/2015

Construction Engineer

Arabian Consulting Engineering Center, Jeddah, Saudi Arabia

Contract No. K-B-5-MA-429 Construction of Additional Berths in King Faisal Naval Base, Phase I, Phase II, Phase III, Phase IV and Phase V

The Phase I of the project includes the following Marine, Civil, Mechanical and Electrical works:

  1. Scope of Marine/Civil/Structural Works – Construction of two new piers (7 & 8) with quay wall, rockfill under the quay wall and rigid pavement topping all 200m long and 25m wide.
    – Construction of three new wharfs (M,N & O) each with 150m long quay walls, rockfill behind and under the quay walls and soil reclamation.
    – Construction of reinforced concrete utility tunnels having precast Concrete covers
    – Dredging and Reclamation works: 1,988,287 m3
  2. Scope of Mechanical works
    – Installation of pumping stations for potable water, sanitary sewage and seawater/firefighting systems including all associated fittings and piping networks.
    – Installation of diesel fuel piping network to wharfs and piers.
    – Installation of compressed air system and associated piping network.
    – Installation of hydraulic system for automatic control valves.
  3. Scope of Electrical Works
    – Construction of MV and LV Substations, Ring Main Units including cables, ducts, etc.
    – Installation of new MV Switchgear, ATS and 13.8 KV Distribution Switchgear.
    – Installation of High mast lighting.
    – Installation of Fire Alarm, Telephone and Earthing systems including cables, splitters, etc.
    – installation of Fiber Optic Cables, conduits etc.
  4. Installation of Pier and Wharf Furniture
    – Pneumatic Cylindrical Rubber Fenders. O.D. 1,350mm;
    Length: 2,500mm [83 nos.].
    – Rubber Fenders of size:
    300mm D x 600mm W x 1,500mm L [180 nos.]
    300mm D x 600mm W x 2,000mm L [200 nos.]

Owner

Power and Water Utility Company for Jubail and Yanbu (Marafiq)

Location

Yanbu, Saudi Arabia

Construction Period

09/2011 - 07/2014

Construction Engineer

Jacobs Engineering UK Limited (Project Management Consultant) United Kingdom

Contract No. 7200019010 Seawater Cooling Pipeline Network - Yanbu 2 Power and Water Project

Design, procurement, construction, testing and commissioning of a seawater cooling pipeline network consisting of the following:
Supply and return seawater cooling pipelines to and from Yanbu Industrial City II together with a spare supply / return pipeline consist of GRP pipes. Each pipeline (3 nos.) is approximately 6 Km in length, its diameter varies from 1m up to 2.8m and are to be laid in common trench. The mechanical works consist of valves including isolation (butterfly) valves, air valves and pressure reducing valves. The electrical works include the:

  • Actuators for operation of butterfly valves greater than 600mm diameter together with local cabinet for electrical isolation and connection point for a mobile electrical generator.
  • Earthing for valves / actuators.
  • Cathodic protection will be provided for underground and submerged metallic structures.
  • Instrumentation for controlling the pressure valves and motorized valves.

Major Quantities:

  • Excavation for Pipes: 510,857 m3
  • Excavation for valve stations: 50,600 m3
  • Backfilling for valve stations: 38,300 m3
  • Structural backfill: 227,694 m3
  • Concrete (all grades): 11,270 m3
  • GRP Pipe (dia. 2.8m): 3,836 L.M
  • GRP Pipe (dia. 1.5m): 1,300 L.M
  • GRP Pipe (dia. 1.0m): 243 L.M
  • Asphalting: 2,530 m

Owner

Saudi Electricity Company

Location

Jeddah, Saudi Arabia

Construction Period

05/2009 - 06/2012

Construction Engineer

A.M. Al-Issa(Al Issa-Kuljian) Consulting Engineer, KSA

Shoaiba Power Plant Extension Stage III, Subcontract for civil works

The subcontract works include the following:

  • Fabrication of structural steel items
  • Industrial buildings structural steel erection includes; Turbine house, electrical control building, water treatment building & neutralization building and electro static precipitators. Also included structural steel erection for cooling water intake pumphouse, pipe / cable racking & other minor structures
  • Power blocks area various buildings foundation works include concrete, formwork and reinforcement.
  • Construction of bridges over discharge and intake channel.
  • Road works include power plant road, soil improvement and earthworks
  • Storm water drainage system, underground network, water network, and site services (cable ducts) also included in this contract.

Owner

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Location

Jubail, Saudi Arabia

Construction Period

04/2009 - 02/2011

Construction Engineer

Construction Dept. of Royal Commission for Jubail and Yanbu

Contract No. 204 - C43R Construction of Support Facilities for King Fahd Industrial Port Berths - Phase I

The contract includes procurement and construction of structural steel hose towers for berths 31 to 35, to accommodate 24 boom hoses. The work covers construction of hose tower main steel structure, pipe supports/racks structures, fire water system and safety equipment, potable water system, nitrogen supply system, mechanical cranes, electrical instrumentation & control, telecommunication and complete operator’s shelter with all finishes and accessories.

Owner

Saline Water Conversion Corporation (SWCC)

Location

Jubail, Saudi Arabia

Construction Period

02/2006 - 05/2009

Construction Engineer

SWCC Planning Dept.

Rehabilitation of Selected Concrete Structures in Jubail Desalination Plants (Ph I & II) and Housing Compound

The scope of work for the Contract No. 2 included concrete repair and rehabilitation works for various areas and structures of desalination plants under Phase I & II as follows:

  • Desalination areas and Power Plant areas.
  • Boiler area and Power House
  • Intake Structures including Chlorination area
  • Power Utility Structures
  • Seawater Booster Pump House
  • Cable Tunnels, Trenches and Pits
  • Outfall Channel and Discharge Outlets
  • Blending Stations
  • Pipe Bridges
  • Road Bridges

Owner

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Location

Jubail, Saudi Arabia

Construction Period

11/2006 - 03/2009

Construction Engineer

Construction Dept. of Royal Commission for Jubail and Yanbu

Contract No. 226-C17 Construction of 3 Berths (31, 32 and 33) at King Fahd Industrial Port

Construction of 3 berths to handle seagoing tankers ranging from 3,000 dwt to 80,000 dwt. For each berth the jetty structure consist of a loading platform, 5 nos. breasting dolphins, 4 nos. mooring dolphins, an access trestle, 6 nos. catwalks, all supported on tubular steel piles, concrete works and associated structural steel together with wharf fittings. The mechanical works include HVAC, firewater system, potable water system, slop water systems, substation, cables, switchgear, lighting and navigational aids. Also includes roads, paving’s, culverts and building works.

Owner

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Location

Jubail, Saudi Arabia

Construction Period

04/2007 - 06/2008

Construction Engineer

Construction Dept. of Royal Commission for Jubail and Yanbu

Contract No.204-C45R Procurement and Construction of Support Facilities for Pipeline Corridor Phase III at King Fahd Industrial Port, Jubail, Saudi Arabia (Project in 50% Association)

Procurement and Construction of hose tower for berth 37 to accommodate 20-30 boom hoses. The contract includes the following main works: 

  •  Steel structures for hose tower and pipe rack, platform and stores.
  • Sprinkle System for hose tower and fire fighting brackets.
  • Main head, branches, piping tie-in etc.
  • Supply and installation of hydraulic power pack, sliding beam winches, hydraulic crane and maintenance jib crane.
  • Electrical, instrumentation, control and telecommunication systems
  • Construction of operator’s cabin

Major Quantities:

  • Structural steel works: 255 mt
  • Piping works : 1,921 lm

Owner

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Location

Jubail, Saudi Arabia

Construction Period

05/2006 - 02/2008

Construction Engineer

Construction Dept. of Royal Commission for Jubail and Yanbu

Contract No. 226-C16 Construction of 2 Petrochemical Berths (34 and 35) at King Fahd Industrial Port in Jubail, Saudi Arabia (Project in 50% association)

The contract included procurement and construction of two new berths 34 and 35, to handle sea going petrochemical tankers ranging from 3,000 to 80,000 dwt.

Each berth consisted of a reinforced concrete loading platform, an approach roadway, a low level steel pipe rack and berthing and breasting dolphins interconnected by tubular steel catwalks, all supported on driven tubular steel piles with cathodic protection.

The berths are complemented by a flexible mooring and fendering system consisting of five breasting dolphins and four mooring dolphins fitted with fenders and quick release hooks.

Each petrochemical berth consists of the following main structures and berth equipment: 

  • One (1) loading platform with deck drainage system
  • One (1) approach roadway
  • One (1) low level pipe rack from shoreline continuing under deck to apertures for product pipe risers
  • Plinths
  • Five (5) breasting dolphins with fenders, four of these are equipped with quick release hooks.
  • Four (4) mooring dolphins with quick release hooks.
  • Four (4) catwalks interconnecting mooring dolphins and outer breasting dolphins
  • Two (2) walkways from loading platform to breasting dolphins
  • Associated handrails for all berth elements
  • Service tower with gangway to vessel and 2.5t capacity crane.
  • Laser docking system, berthing and mooring instrumentation relayed to operator’s Shelter
  • Fire monitor tower and berth fire water system and associated support structures, connections at onshore interface points
  • Power supply systems and instrumentation for marine and berth utility equipment; connection at onshore interface points or substations; berth lighting and navigation lights
  • Berth telecommunications, CCTV and PA systems
  • Impressed current cathodic prevention systems for reinforced concrete elements and piles, coating systems for steelworks
  • Operator’s Shelter with all required services, integrated berth control system, PC monitoring station, MCC room and fire control station
Major Quantities (for two berths): 
  • Concrete : 3,430 m3
  • Reinforced steel : 640 m.t
  • Structural steel : 650 m.t
  • Stainless steel : 36 m.t
  • Tubular steel piles: (Dia. 914mm and 1,650mm) = 5,896 l.m.

Owner

Saline Water Conversion Corporation (SWCC)

Location

Jubail, Saudi Arabia

Construction Period

02/2005 - 12/2007

Construction Engineer

SWCC Planning Dept.

Rehabilitation of Selected Concrete Structures in Jubail Desalination Plants (Phase I & II) and Housing Compound - Contract No. 1 Jubail, Saudi Arabia (Project in J.V.)

The concrete repair and rehabilitation works for Contract No. 1 are follows: 

  • Concrete repair of 4 units of desalination pump pits (walls, slabs and pedestals etc.), evaporator slabs and pedestals, hot well tanks and small structures.
  • Concrete repair of seawater intake structures including provision of cofferdams.
  • Concrete repair of 6 units of Phase I and 36 units of Phase II and the scope of work same as previously described for desalination units.
  • Concrete repair of slabs/walls of Cable Tunnels, Trenches and Pits
 

Owner

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Location

Yanbu, Saudi Arabia

Construction Period

08/2002 - 02/2007

Construction Engineer

Procurement Department, Royal Commission for Jubail & Yanbu, Directorate General for Yanbu Projects

Contract No. PIC-B-1176, Seawater Cooling System Expansion at Yanbu Industrial City, Saudi Arabia (Project in Association)

The Contract included engineering, procurement and construction for expansion of seawater cooling supply and return lines to serve industrial growth and to the growth in the steam power generation and desalination plant and to improve reliability of seawater supply in northern sector petroleum area.

The major items of work involved are supply and installation of FRP pipes, including excavation, sheet piling, dewatering and backfilling.

Construction of reinforced concrete chambers, access manhole, outfall structures and thrust blocks. 

  • Diameter of FRP pipes :3,700mm
  • Total length of pipelines :9,050m

The Contract also included 15 KV cables, 1125 KVA secondary unit stations and cathodic protection works.

 

Owner

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Location

Jubail, Saudi Arabia

Construction Period

05/2004 - 06/2006

Construction Engineer

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Contract No. 226-C14 Procurement and Construction of Petrochemical Quay No. 2 at King Fahd Industrial Port, Jubail, Saudi Arabia (Project in 50% J.V.)

Procurement and construction contract involving the following major works: 

  • Reclamation of new quay area of 860,000 sq. m. from
  • 1.2m to +5m by obtaining the dredged material from dredging the access channel adjacent to the site.
  • Deepening of berths 31 to 33 to depth from -5 m to -14.3 m.
  • Rock fill revetment with rock armoured external slopes to contain the reclamation filling.
  • Infrastructure and utilities on the new Quay including perimeter asphalt road, service roads, pipeline sleepers, steel pipe bridge foundations and structures, area lighting, fire water and potable water systems etc.
  • Dredging of the Fanateer Marina, reclamation of the adjacent land and the shore line protection of the marina 2250 m long.

Owner

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Location

Jubail, Saudi Arabia

Construction Period

05/2004 - 06/2006

Construction Engineer

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Contract No. 072-C05 Procurement and Construction of Seawater Cooling Pumphouse No. 2 at Jubail Industrial City, Saudi Arabia (Project in Association with Almabani)

The main purpose of the project was to increase seawater cooling system capacity at Jubail industrial city by the construction of the second seawater cooling pumping plant and auxiliary facilities to meet the demand of water by the industries. The second pumping plant will increase a total combined capacity of189 cu.m./sec.

Civil, intake and building works:

The works covered under this contract included extension of dredged intake channel and supply channel, pumping plant workshop, headworks, electrical equipment building, chlorination plant building and pumphouse.

A third standby generator, one boat launching ramp, one VIP pier, a workshop substation, a mosque and new control panels to be installed in the existing control building. 

Electrical, mechanical and instrumentation works: 

Installation, operation, testing and commissioning of 14 seawater cooling pumps each of 2MW capacity and 13.5 m3/sec capacity, with associated chlorination equipment, four drum screens, twenty eight headworks sluice gates, chlorination gates and drainage gates. One standby gas turbine generator, electrical equipment and cables, two gantry cranes and one workshop crane. 

Chlorination distribution pipework and valves, seawater cooling pump discharge piping. Electrical cabling conduits, fittings, cable tray for lighting, grounding, cathodic protection and fire alarm system.

Also included are surface water drainage, foul water drainage, potable water system, oil water and emergency acid drainage system, treated water irrigation system and oil spill protection system. Pumphouse Cofferdam size 116.5m x 64.5m and depths 15.7m and 17.7m

Owner

Saudi Electricity Co. Jeddah

Location

Jeddah, Saudi Arabia

Construction Period

10/1999 - 06/2003

Construction Engineer

ABB Sadelmi Spa, Italy

Installation of Concrete Pipes for Cooling Water System in Shoaiba Power Plant 5 x 350 MW Project, Saudi Arabia

The subcontract covers execution, completion and maintain the following works related to the installation of concrete pressure pipes for cooling water system:

  •  Unloading and Storing of Pipes
  • Inspection and QA/QC Reports, Loading and Transportation to the Site
  • Lifting and Lowering to the Trench
  • Fitting/Assembly of Pipe strings and testing of joints
  • Pipe Bedding

Owner

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Location

Jubail, Saudi Arabia

Construction Period

09/2000 - 09/2002

Construction Engineer

Royal Commission for Jubail and Yanbu, Directorate General for Jubail Projects

Contract No. 073-C14 Procurement and Construction of Upgrade of R.O. Plant and Support Facilities, Jubail, Saudi Arabia (Project In Association With Almabani)

The scope of work of the contract consists of the procurement and construction of the expansion to the potable water production capacities at the existing R.O water treatment plant (wtp). The upgrade and associated support facilities include raw water supply system, potable water distribution networks, addition of a potable water distribution network and the addition of a potable water pump at the north west station. The expansion of the R.O. plant include the new installation of three 7,570 cubic meter per day water plants.

The expansion of the existing water treatment facilities will include a new pump station consisting of four pumps, four new raw water wells, four replacement raw water and offsite potable water and brine pipelines. The scope of work includes all associated civil, mechanical, piping, electrical and instrumentation works.

Owner

Royal Commission for Jubail & Yanbu, Directorate General for Jubail Projects

Location

Jubail, Saudi Arabia

Construction Period

04/1999 - 06/2000

Construction Engineer

Directorate General for Jubail Project, Jubail, Saudi Arabia

Contract No. 083-C10 Modifications to Existing Industrial Waste Water Treatment Plant and Pump Stations

The modification works under the contract for the existing industrial waste water treatment plant and pump stations are described as below:
Stage I Works:
1. Removal of old and installation of new following items:
– All lagoon liners for the seven wastewater lagoons.
– All aerators and the submersible cables from the aerators to the motor control panel.
– All lagoon sluice gates actuators and monitoring devices.
2. Replacing existing pumps with larger capacity pumps in emergency pump station no. 1
3. Installation of an effective oil removal system
4. Modifications to electrical cabling and installation of 4 pumpalternators
Stage II Works:
1. Installation of 4 nos. new dual media pressure filters.
2. Replacement of existing control system for the filters.
3. Modification as required to the chlorination system
4. Installation of new Motor Control centre, instrument
panel, chlorine gas detectors and replacing the existing fire alarm system

Owner

Saline Water Conversion Corporation (S.W.C.C.)

Location

Yanbu, Saudi Arabia

Construction Period

03/1991 - 02/1999

Construction Engineer

The Kuljian Corporation in association with Al-IssaConsulting Engineering, Riyadh

Madinah-Yanbu M.S.F. Desalination Plant, Phase 2 - Lot 2

The contract is for the supply on a turnkey basis of a desalination plant to
be installed in Yanbu.
The scope of works included :
– four desalination units of 35,900 m3/day each
– seawater system and chlorination
– CO2 plant and chemical dosing system
– utility piping system
– substation and electricity system
– lighting and earthing system
– cathodic protection system
– instrumentation and computer control for the desalination units
– buildings, roads, bridges, sewers and warehouse
– fence and gates and landscaping

Owner

Saline Water Conversion Corporation, Riyadh

Location

Al Khobar, Saudi Arabia

Construction Period

09/1996 - 12/1998

Construction Engineer

Fitchner Consulting Engineers

Al-Khobar Desalination Plant, Phase III, Lot 1B, Subcontract for Construction of Shoreline Protection and Outlet Structure Al-Khobar

The major works for the contract include excavation of seabed,
construction of shoreline protection and scour protection for
outfall channel.
Total excavation : 8,709 cu. m.
Rocks for shore Protection : 19,600 cu. m.

Owner

Royal Commission for Jubail & Yanbu

Location

Jubail, Saudi Arabia

Construction Period

08/1997 - 06/1998

Construction Engineer

Royal Commission for Jubail & Yanbu

Contract No. 072-C12R Site Preparation (Cofferdam and Seawall) for Seawater Cooling Pumphouse No. 2 Jubail

Contract for the construction of temporary pumphouse cofferdam
and permanent seawall segments.
The work included the installation of cofferdam walls and anchors,
cofferdam well point and deep well dewatering system, seawall
sheet piles, anchors and tie backs and seawall and tie back area
back filling.

Owner

Saline Water Conversion Corporation, Riyadh

Location

Yanbu, Saudi Arabia

Construction Period

01/1997 - 08/1997

Construction Engineer

Electrowatt Engineering Services Madinah / Yanbu Project Office, Yanbu Al Bahr, KSA

Repair of the buildings and civil structures at Yanbu Desalination and Power Plant Yanbu

The contract for the repairing of damages caused to the buildings
due to fire. The work included the repair of damaged wall and roof
panels, false ceiling and steel structures and erection /
construction of the same. Also included the repair of cracks on
floors, restoration of decking system, painting of doors, windows
and steel structures and fixing of fans.

Owner

Saudi Seaports Authority Dammam Port Management

Location

Dammam, Saudi Arabia

Construction Period

05/1995 - 05/1997

Construction Engineer

Sir Bruce White, Wolfe Barry and Partners Dammam

Contract No. 135 B Maintenance of Marine Works at Aziziyah, Dammam Port

The major maintenance and repair works under the contract are
as follows:
– Refurbishment of Marine Gate Components
– Refurbishing of deteriorated areas of 294 piles in the splash zone
– Refurbishing of 98 ladders and fixings etc. including replacement
of deteriorated components
– Cleaning of 98 nos. Stainless Steel Nets and Sinkers
– Refurbishing of 294 nos. joints between Pile and Pile Head
Assembly to a depth of 500 mm
– Refurbishing of Pile Head Assembly
– Removal, refurbishing and reinstallation of 2 nos. mesh columns

Owner

Saline Water Conversion Corporation, Riyadh

Location

Jeddah, Saudi Arabia

Construction Period

08/1995 - 04/1997

Construction Engineer

Ewbank Preece Power & Water Ltd. Shoaiba

Shoaiba Phase II Lot 1B, MSF Desalination Plant Subcontract for Seawater Pump station and Collecting Channel

The subcontract works include the following main items:
1. Construction of Seawater Pump station.
2. Temporary works associated with seawater pump station including sheet piled cofferdam.
3. Interface work at seawater pump station including supply and installation of crane girders.
4. Construction of reinforced concrete collecting channel including seal pits, pump sumps,
access manhole, stepladders and connection to the seawater discharge channel.
5. Temporary works at collecting channel including shore protection, fencing and storm water
drainage.
6. Engineering works related to seawater pump station and collecting channel.
7.Site installation and services.

Owner

Saline Water Conversion Corporation, Riyadh

Location

Jeddah, Saudi Arabia

Construction Period

08/1995 - 04/1997

Construction Engineer

Ewbank Preece Power & Water Ltd. Shoaiba

Offshore Civil Works for Al-Shoaiba Power & Desalination Plant, Phase II Lot 1B MSF Desalination Plant, Shoaiba

The Subcontract included the following offshore civil works for a 100 mg/day capacity MSF
Desalination Plant :
1. Demolition of fence, cabins, steel tower, concrete blocks and removal and relocation of
lights and shore protection.
2. Construction of 192 m long seawater intake comprising of 3 nos. RTR pipes of 3700 mm dia.
and installed at depths from – 10.0 m to -17.0 m
3. Construction of 3 nos. intake head structures 16 m in length and tapering in shape (3.7 m to
16.0 m), with 30 nos. underwater steel tubular piles of 660 mm dia. Dolphins protection with
12 nos. tubular piles of 1200 mm dia.
4. Construction of 436 m long reinforced concrete discharge channel of 10 m x 4.5 m size and
an outfall structure 90 m long on 660 mm dia. steel tubular piles.
5. 40 m long sheet piled jetty with concrete cope beam face.

Owner

Saline Water Conversion Corporation, Riyadh

Location

Jeddah, Saudi Arabia

Construction Period

06/1993 - 07/1996

Construction Engineer

The Kuljian Corporation in Association with Al-Issa Consulting Engineering, Riyadh

Madinah-Yanbu R.O. Desalination Plant, Phase 2 - Lot 2A/2B Subcontract for Civil Works Yanbu.

The Subcontract covered all civil works necessary for a Reverse Osmosis desalination plant
consisting of 2 units @ of 16.9 Million USG/day capacity. The major works being as under:
– R.O. Plant building – Treatment Building
– Electrical Substation Buildings and Office Building – Pumphouse
– Seawater Intake Pipelines and Basin – Brine Discharge Culvert
– Foundation of slabs for equipment storage silos – Pipe Racks, Cable Trenches
– Underground piping and services – Roads, Drainage works, Fence and
Gates
Major Quantities:
– Seawater Intake Pipelines for R.O. Plant:
– FRP pipes (2,000 mm dia.): 370 lm placed at -13.6 m
– Seawater Intake Pipeline for MSF Plant:
– FRP pipes (2,600 mm dia.): 300 lm placed at -13.6 m
– Various building (Total floor area): 10,606 m2
– Structural steel: 1,270 mt

Owner

Saudi Arabian Oil Company (SAUDI ARAMCO)

Location

Yanbu, Saudi Arabia

Construction Period

04/1993 - 04/1994

Construction Engineer

Saudi Aramco

Contract No. 37683/00 Yanbu Frontier Force Relocation

The works performed under this project are in two different locations.
1.Al Baidha Facilities:
– Development of an area of 135 X 107 m. to required elevation by construction fill and compaction and to provide
Riprap protection, stone topping, etc.
– Construction of one athletic facility building and two barrack buildings.
– Construction of concrete paved training area and sidewalks.
– Construction of asphalt concrete paved area.
– Construction of underground concrete tanks, one for potable water storage and other for sewage
holding/septic tank.
– To provide complete utility system and appurtenance like water system, sewer system, electrical and telephone
facilities, etc.2.Crude Oil Terminal Pier Facilities:
– Construction of a concrete slab pier, 44m. long supported on pre-cast concrete caissons including necessary
dredging works to achieve a minimum boat draft of 2.50 m.
– Construction of single story Pier Guard House building of 20 sq. m. area.
– Construction of an underground sewerage holdings septic tank of reinforced concrete with 15.50 M3 capacity.
– Demolition and removal of existing Frontier forces Portable Barrack buildings.
– Provide complete utility system like water supply, sewer system, effluent leaching fields, electrical and telephone
facilities.

Owner

Saudi Consolidated Electric Company (SCECO), Western Region

Location

Rabigh, Saudi Arabia

Construction Period

12/1991 - 10/1992

Construction Engineer

Saudi Consulting Services, Riyadh

Rabigh Steam Power Plant Extension Contract No. 1016 CC/1018 CC. Subcontract for Cooling Water System and Discharge Culverts.

The subcontract works for the contract includes laying, jointing and testing
of pipes for seawater circulation to/from condenser of CC1026 and CC1018.It
also includes construction of 211 m long discharge culvert. The major
quantities of pipes installed and tested are as under: (pipes supplied by
main contractor) Reinforced Concrete
Pipes QTY
Dia. 1600 mm. 406 m.
Dia. 2200 mm. 754 m.
Dia. 2800 mm. 660 m.
Dia. 3000 mm. 360 m.
Dia. 4000 mm. 471 m.
Total 2,651 m.

Owner

Saudi Arabian Marketing & Refining Co. (SAMAREC)

Location

Yanbu, Saudi Arabia

Construction Period

12/1991 - 10/1992

Construction Engineer

Designed :Acer Sir Bruce White – UK Consultants :Engineering Dept. of SAMAREC

Project No. 302 Upgrading Marine Berth (92), Yanbu Refinery, Saudi Arabia

The project includes upgrading of two existing Breasting Dolphins for a
Tanker Berth by the installation upon each Dolphin of two additional tubular
steel piles of outer dia. 1067 mm x 34 m driven 13 m (-30 m toe elevation) into
the seabed together with modification to the structural steel deck to
accommodate the piles and a new fendering system to suit the larger size of
vessel (up to 80,000 DWT) Total piling work: 2 no. x 2 no x 34m = 136 m. Also
included was the design and installation of Cathodic Protection System for
the four piles to suit the existing system.

Owner

Saudi Aramco Main contractor: Snamprogetti, Italy

Location

Yanbu, Saudi Arabia

Construction Period

10/1990 - 07/1992

Construction Engineer

Saudi Aramco

IYECP - Civil works for Tank Farm and Causeway at Yanbu, Saudi Arabia (Subcontract)

Construction of civil works for Tank Farm, Causeway and certain buildings.
The subcontract for civil works includes:-Construction of Tank Ring-Wall
Foundation.-Fire water pumping station-Dikes and Slopes-Piling works at
causeway for steel structures as catways for supporting new
pipeline.-Evaporation Ponds and Swells-Seawater intake-Roads &
pavement and fencing.

Owner

Saudi 32 Seaports Authority

Location

Qatif, Saudi Arabia

Construction Period

01/1991 - 06/1992

Construction Engineer

Sir Bruce White Wolfe Barry and Partners

Contract No. 143 Construction of Port of Qatif

A Marine works project for the construction of 180 m. long Quay wall, 140 m
long Breakwater and 1.2 km long Causeway.
-Dredging of Access Channel and Harbour basin.
Total quantity of Dredging: 250,000 cu.m.
-Surfacing of 26,000 sq. m. area with Asphalt
-Various External Services including water pipeline, electrical services
and construction of a Substation.

Owner

Ministry of Interior, Directorate General of Frontiers Force

Location

Jeddah, Saudi Arabia

Construction Period

01/1991 - 09/1991

Construction Engineer

Owner's Technical Services

Construction of Naval Training Institute Berth in Jeddah, Al- Sharoom Berth and Berth at open Shoeba

The contract for the construction of marine and other
services facilities at three different locations as described
below:
Jeddah:
– 80 m long Berth
– Raising level of existing Berth (60 m) by 1 m.
– Dredging up to -5.0 m.-Diesel Tank (30 m3)
– Services (water, fuel, electricity and telephones)
Al-Sharoom:
– Berth 80 m.
– Dredging work (approach channel and turning circle)
– Asphalt road
– Beacons (2 nos.)
– Services (water, fuel, electricity and telephones)
Al-Shoeba:
– Berth 30 m.- Services (water, fuel, electricity and
telephones)

Owner

Mohammad Binladin Org. Jeddah

Location

Madinah, Saudi Arabia

Construction Period

03/1989 - 05/1991

Construction Engineer

Dar Al Handasah Jeddah, Saudi Arabia

Diaphragm Wall Construction for External Works of Prophet's Mosque at Madinah, (J.V. with Saudi Bauer Ltd.)

Construction of Cellular and Linear Diaphragm wall of
300,000 m2 for the Parking Area. Removal of surplus
material from excavation. Supply of steel and fabrication
of reinforcing cages.

Owner

Saudi Seaports Authority

Location

Dammam, Saudi Arabia

Construction Period

11/1990 - 07/1991

Construction Engineer

Sir Bruce White, Wolfe Barry & Partners

Contract No. 139 Repair Works to damaged Quay wall at Berth 3, King Abdul Aziz Port, Dammam.

Breaking of existing reinforced concrete Apron
Slabs Capping Beams. Removal of existing
damaged Quay wall block work and replacing
with new blocks. Removal and renovation of
existing Bollards and Fenders for Re-use.
Supply and installation of New Fenders.
Rerouting of existing Electrical and other
services.

Owner

Mutual Marine Services Al Mushtaraka Ltd.

Location

Yanbu, Saudi Arabia

Construction Period

12/1989 - 06/1990

Construction Engineer

Engineering Department of Saudi Seaports Authority

Repair of Damaged Quay wall at Berth No. 26 and 27 at Jeddah Islamic Port

The works comprise the repair of a section of
quay wall of minimum length 15.5 m on Berth
No. 26 and 7.8 m on Berth No. 27 of Jeddah
Islamic Port. Removal and re-fixing of existing
Bollards and Fenders and supply and
installation of new Fenders. Full testing and
commissioning of all systems in the repair
works.

Owner

Royal Commission for Jubail & Yanbu

Location

Yanbu, Saudi Arabia

Construction Period

06/1989 - 12/1989

Construction Engineer

Saudi Arabian Parsons Ltd. Yanbu Al Sinaiyah

Contract No. PIC-B-1184 Electrical Power Distribution to Southern Sector Phase I Madinat Yanbu Al Sinaiyah.

The works include supply and installation of 35 KV radial
Feeder of length 299 m from existing 35 KV Switch Gear.
15KV Feeder of length 222 m.
Also include supply and installation of 35 KV Outdoor
Pad-Mounted Switch Gear

Owner

Saudi Cable Company, Jeddah

Location

Jeddah, Saudi Arabia

Construction Period

07/1988 - 07/1989

Construction Engineer

Zuhair Fayez & Associates, Jeddah

Telecommunication/Cable Plant Jeddah. Building works and Mechanical / Electrical Services Contract, Jeddah,

Construction of Telecommunication Cable Plant
building works
including all Mechanical & Electrical Services facilities.

Owner

Saudi 38 Seaports Authority

Location

Yanbu, Saudi Arabia

Construction Period

09/1988 - 07/1989

Construction Engineer

Saudi Seaports Authority Engineering Department

Supply and installation of Beacons, Port of Yanbu, Saudi Arabia

Supply and installation of Forty (40) Port and
offshore beacons equipped with Solar
Powered Navigational lights on the reefs in the
vicinity of the Port of Yanbu.

Owner

Mohammad Binladin Organization

Location

Tuwal, Saudi Arabia

Construction Period

10/1988 - 06/1989

Construction Engineer

Mohammad Binladin Organization

Riprap for Onshore/Offshore Seaside Palace at Tuwal Island

Supply, transport and construction of
Onshore/Offshore Riprap Protection for sea
Palace at Tuwal Island.
– Length of Slope protection : 2,315 m
– Dredging : 20,000 m3
– Rock Riprap : 70,000 m3

Owner

Saudi Seaport Authority

Location

Jeddah, Saudi Arabia

Construction Period

02/1988 - 03/1989

Construction Engineer

Jeddah Islamic Port, Jeddah, Saudi Arabia

Construction of Civil, Electrical and Mechanical Works at Jeddah Islamic Port including Sewage Pumping Station, Jeddah, Saudi Arabia

Supply and erection of High Pressure Cables for a total
length of 7,700 m together with Naval Guide Cables
including all Civil Works such as excavation, filling and
performance of all test required for the cables.

Owner

Saudi Seaports Authority

Location

Dammam, Saudi Arabia

Construction Period

07/1987 - 02/1988

Construction Engineer

Sir Bruce White, Wolfe Barry and Partners, Douglas Street, Victoria London SW1, England

Contract for the construction of Berthing facilities at Aziziyah, Dammam

Construction of 3 Dolphins and Dredging of the basin.
Relocation of
existing structure, design and construction of
Submersible Gate of 100
m width. Design and construction of Walkway

Owner

Ministry of Municipal & Rural Affairs

Location

Al Khobar, Saudi Arabia

Construction Period

01/1986 - 03/1989

Construction Engineer

Ministry of Municipal & Rural Affairs,

Eastern Region Corniche, Al Khobar, Dammam Sub-contract

Formation and Protection of approx. 8.5 km of
Coastline including Dredging, Earthworks
Protection, Drainage and construction of
special structures and construction of one
bridge

Owner

Saline Water Conversion Corporation

Location

Assir, Saudi Arabia

Construction Period

08/1986 - 01/1988

Construction Engineer

Electrowatt Engineering Gizan/ Assir, Saudi Arabia

Assir Desalination and Power Plant-Phase 1, Lot 1 B Sub-contract for offshore Works

Dredging of 680 m long Intake Channel,
Construction of two Jetties, each 680 m. long,
one 65 m. long and 10 m. wide Berth at a depth
of – 4.40m, a 250 m long Breakwater as well as
supply and Installation of a complete single
point Mooring System and 3850 m. of Offshore
Fuel Oil Pipeline.

Owner

Mutual Marine Services -Al Mushtaraka Limited

Location

Jeddah, Saudi Arabia

Construction Period

06/1987 - 12/1987

Construction Engineer

Sir William Halcrow and Partners Jeddah, Saudi Arabia

Repairs of Damaged Quay wall at Berth No. 2, Jeddah Islamic Port.

Repair of Section of Quay wall of length 15.5 m on Berth
No. 2 together with associated Apron Slabs behind
Berth No. 2 and repairs to Capping Block joints and
Crane Rails on Berth No. 3

Owner

Saudi Seaports Authority

Location

Dammam, Saudi Arabia

Construction Period

07/1986 - 11/1986

Construction Engineer

Sir Bruce White, Wolfe Barry and Partners, Douglas Street, Victoria London SW1, England

Contract No. 159, External Works of Aziziyah, Dammam

Civil and Marine Works including Security Perimeter,
Watch houses, Entrance Structure, 68 m. wide Water
Moat, Crash Barrier; also construction of two Rock
Breakwaters each 150 m long and 17 m wide, inner and
outer Booms, as well as Electrical and Mechanical
Works.

Owner

Ministry of Defense and Aviation

Location

Al Khobar, Saudi Arabia

Construction Period

07/1985 - 06/1987

Construction Engineer

Ministry of Defense and Aviation Riyadh, Saudi Arabia

Jeddah Naval Base Ship Repair Quay Subcontract

– Demolishing existing service quay of 260 m. in
length.- Demolishing existing Water Intake
Tower and 1000 mm dia. pipeline.-Dredging of
Basin 650,000 m3-Backfilling 193,000
m3-Construction of 380 m long New Quay wall
consisting of 264 Bored Concrete Piles, 31 m in
length, 1000 mm in dia.; and RCC Deck
Structure with Utility Tunnel as well as relative
Marine Accessories. Construction of Rock Dike
for shore protection.-Construction of Intake
Tower and laying of 1000 mm Dia. pipe, 700 m
in length for existing desalination plant.

Owner

Royal Commission for Jubail & Yanbu

Location

Assir, Saudi Arabia

Construction Period

02/1985 - 09/1986

Construction Engineer

Saudi Arabian Parsons Yanbu Al Sinaiyah

Contract No. PIC-D-1311 Navigational Aids, Southern Access Channel, Yanbu

Supply and Installation of Solar Powered
Off-shore Lighthouse at a water depth of 12 m.
on steel piles, 1300 mm dia. each, lighted and
Radar Beacons, and eight Solar Powered light
Buoys.

Owner

Ministry of Finance & National Economy

Location

Jeddah, Saudi Arabia

Construction Period

11/1985 - 07/1986

Construction Engineer

Dar Al Handasah Jeddah, Saudi Arabia

New Diwan Underpass in Jeddah, Awarded on a Subcontract basis.

The Project includes a 600 m. long and 8 m deep
subterranean passage with two 38 m. long, 23 m wide
bridges. 1760 Tension piles up to 25 m. long were driven
at a depth of 34 m.; 60,000 m3 of concrete were used.
Excavation: 150,000 m3 diaphragm walls and special
Geotechnical applications were utilized to contain the
high water level reaching to almost half meter below
ground

Owner

Saudi Seaports Authority

Location

Dammam, Saudi Arabia

Construction Period

09/1983 - 01/1985

Construction Engineer

Sir Bruce White, Wolfe Barry and Partners, Douglas Street, Victoria London SW1, England

Contract No. 127Construction of a Special Berth at Aziziyah, Dammam

Causeway of 400 L.M., Buildings, Services, Paving and
Electo-Mechanical work. Dredging : 349,600
m3Reclamation : 360,000 m3 Rockfill : 140,710
m3Paving : 7,000 m2

Owner

Saudi Seaports Authority

Location

Jeddah, Saudi Arabia

Construction Period

09/1982 - 07/1986

Construction Engineer

Lockwood Greene International Spartanburg South Carolina, U.S.A

Construction of Northwest Extension at Jeddah Islamic Port

Construction of 2,250 m of Quay walls for Five
Deepwater Berths, Ro- Ro facilities and a Small
Craft Harbor as well as buildings, pavements,
utilities and Electrical & Mechanical works,
surface water drainage and a sewerage works.

Owner

Saudi Seaports Authority

Location

Jeddah, Saudi Arabia

Construction Period

07/1982 - 12/1984

Construction Engineer

Sir Bruce White, Wolfe Barry and Partners, Douglas Street, Victoria London SW1, England

Construction of Livestock Terminal at Jeddah Islamic Port

Construction of 500 m. long Quay walls,
Pavements, a Discharging Station, several
Canopies, an Equipment Warehouse, an
Incinerator, and Sewerage works

Owner

Saudi Seaports Authority

Location

Jizan, Saudi Arabia

Construction Period

06/1981 - 08/1984

Construction Engineer

International Hydraulic Overseas, P.O. Box 61, Gizan

Port of Jizan - Security Forces Facilities

Dredging and Breakwater Construction, Reclamation,
Quay walls, Electrical-Mechanical, Paving, Services,
Buildings, Sewerage Treatment Plant, etc

Owner

Saudi Seaports Authority

Location

Jizan, Saudi Arabia

Construction Period

11/1982 - 12/1983

Construction Engineer

International Hydraulic Overseas, P.O. Box 61, Gizan

Berthing facilities for Saudi Fisheries Company, Jizan

Construction of 140 L.M. of Quay wall and associated
services and Two Substations

Owner

Royal Commission for Jubail & Yanbu

Location

Jeddah, Saudi Arabia

Construction Period

05/1981 - 04/1984

Construction Engineer

Arabian Bechtel Co. Ltd Jeddah, Saudi Arabia

Contract 082-C46, Jubail Procurement and Construction

Construction of Pre-stressed and Reinforced
Concrete Bridges. (Concrete: 40,000 m2,
Excavation: 100,000 m3, Filling: 70,000 m3), as
well as 5 km road and 3.1 km Highway ditch. The
bridges have been constructed on
Cast-in-place concrete Piles of dia. 1000 mm,
Total Quantity 6,900 L.M.. Works also include
site grading, Sub-base and base, paving, traffic
control and various utilities.

Owner

Royal Commission for Jubail & Yanbu

Location

Jubail, Saudi Arabia

Construction Period

01/1982 - 12/1983

Construction Engineer

Arabian Bechtel Co. Ltd Jeddah, Saudi Arabia

Contract no. 076-C10, Subcontract for Lines and Pump Station at Westside Corridor, Jubail, Saudi Arabia

Construction of Power Distribution lines and
Pump Stations at West Side corridor No. 2 at
Jubail Port.

Owner

Ministry of Municipal and Rural Affairs

Location

Jeddah, Saudi Arabia

Construction Period

11/1982 - 11/1983

Construction Engineer

Ministry of Municipal and Rural Affairs

Contract No. 182/3/19 Sea Deepening in the City of Jeddah

Dredging 1,000,000 m3 and filling 1,050,000 m3

Owner

Saudi Seaports Authority

Location

Jubail, Saudi Arabia

Construction Period

08/1982 - 05/1983

Construction Engineer

Lockwood Greene International Spartanburg South Carolina, U.S.A.

Completion of Slipway and Marine Workshops, Jubail

Extension of the Slipway by 30 meters in length and
lowering the end 2 meters in depth. Completion of
Workshop concrete floor.

Owner

Saudi Seaports Authority

Location

Jeddah, Saudi Arabia

Construction Period

06/1981 - 11/1983

Construction Engineer

Sir Bruce White, Wolfe Barry & Partners, Douglas Street, Victoria London SW1, England

Port of Dammam Contract 97B Container Railhead Ancillary Works.

Railway Track, Gantry Crane, Foundations,
Ancillary works and Electrical works for Power
supply of Crane.

Owner

Saudi Seaports Authority

Location

Dammam, Saudi Arabia

Construction Period

06/1981 - 12/1982

Construction Engineer

Sir Bruce White, Wolfe Barry & Partners, Douglas Street, Victoria London SW1, England

Port of Dammam Contract 111, Saudi Seaports Authority Terminal for Explosives

Dredging, Reclamation, Quay construction 340
m. (Caissons), Access road, Railway Track and
Explosives Terminal

logo

SAUDI CONDRECO
COMPANY LIMITED

Contact Us

P.O. Box 11973 , Jeddah - 21463

+966 (012) 6836003

Get A Quote